Materials and team
Materials and team
What the building is made of, and who builds it. Every partner by name.
Materials

Stone
A pale limestone in the lobby, the kitchens and the bathrooms, brushed so it doesn't slip.

Oak
Solid oak floors in the rooms, 20 mm, finished in natural oil.

Brass
Handles, taps and switches in brushed brass, which darkens with the years.

Plaster
The facade in a sand-coloured mineral plaster that breathes and doesn't peel by the sea.
The team
Everyone building it, by name
Developer
Bayit veShoresh, family developer
Since 1991
Builds one building at a time. This is the fifth.
Architecture
Kav Yam Architects
Since 2006
Planned the building round the shade, and the step back on every floor.
Landscape
Gan Tzel Landscape
Since 2011
The garden round the sycamore, its plants and paths.
The tree
Etzim Vatikim, arborists
Since 1998
The first survey, the fence, the watering, and a survey every year to the handover.
Structure
Kora Structural Engineers
Since 1984
Foundations that go round the roots, and no basement under the crown.
Main contractor
Yesodot HaHof, main contractor
Since 1979
The frame, the facades and the finish.
Interiors
Levana veHol Interiors
Since 2015
The stone, the oak and the brass, and three packages for changes.
Legal
Gvul uMigrash, lawyers
Since 2002
The sale contracts, and answers for your own lawyer.
Every name is fictional.
What protects a buyer
- 01Every payment is secured by a guarantee under the Sale Law, sent to you within 14 days.
- 02The project is bank-accompanied: the money goes only into the project's account.
- 03The full specification is sent before you sign, and what's in it goes into the contract.
Book a call
Pick a free half hour, and we call you at the time you chose.