Construction log
Construction log
What happened on the site and when, from the tree's first survey to the handover.
2026
The yearly survey
The tree's yearly survey: healthy leaves. Two low branches were pruned before the sixth floor is poured.
The fifth floor
The fifth-floor slab. The windows for the lower floors arrived on site.
The fourth floor
The fourth-floor slab is poured. The sycamore is fenced and watered every week.
The third floor
The third-floor slab.
The first floors
The first- and second-floor slabs.
The ground floor
The ground-floor slab. The lobby takes shape; the wall to the tree stays open.
2025
Foundations
Piles on the west side, and beams that bridge the roots on the east.
A fence and water
A fence at 9 metres round the sycamore, and water once a week. Digging starts on the west side.
The permit
The building permit.
2024
The plan moves
The building six metres west, the basement out from under the crown.
The tree survey
14 metres tall, a crown 22 metres wide, about a hundred years old. The advice: touch nothing within 9 metres.
Planned
To the handover
- December 2026The sixth-floor slab.
- April 2027The frame is done, the facades begin.
- October 2027Windows, plaster and the flats' finish.
- January 2028The garden and the lobby. The fence round the tree comes down.
- Spring 2028Handover.